The mill was shut down since 1976. Due to leakage of the roof, framing and floors were damages in.
The material inside was not too shabby.
Renovating the floors.
Rénover la vanne de travail
Rénover la roue
Make a spring cleaning.
Set electrical installation in accordance with the standard.
Change the windows.
Unblocking mechanisms and put the wheel operational.
Remettre la veille meule en fonctionnement.